Final BRCP
The final BRCP files below were submitted to USFWS, NMFS and CDFW on June 28, 2019 for final inspection and publication in the federal register (along with the EIS/EIR).
Please note that the "redlined" files below compare the final BRCP with the "screencheck" final BRCP files that were posted here on May 23, 2019. If there is not a redlined version below, that means nothing has changed with the final version of the document since the May 23rd version.
If you have any questions or comments, please email BCAG at cdevine@bcag.org.
Also please note that all tables and figures are at the end of each chapter.
Chapter 1 Introduction
Chapter 3 Ecological Baseline Assessment
Chapter 4 Impact Assessment (redlined)
Chapter 5 Conservation Strategy (redlined)
Chapter 6 Conditions on Covered Activities
Chapter 7 Monitoring and Adaptive Management
Chapter 8 Plan Implementation (redlined)
Chapter 9 Implementation Costs and Funding
Chapter 10 Alternatives to Take
Chapter 11 List of Preparers
Chapter 12 References
Appendix A - Covered Species Accounts
Appendix B - Evaluation of Species Considered for Coverage
Appendix C- Common and Scientific Species Names
Appendix D - Species Occurring in Natural Communities
Appendix E - Project Application Process
Appendix F - Cost and Funding
Appendix G - Placeholder
Appendix H - Placeholder
Appendix I1 - Vernal Pool Mapping Methods
Appendix I2 - Vernal Pool Density Estimation
Appendix J - Placeholder
Appendix K- Effects in Vicinity of Covered Activities
Appendix L - Draft Implementing Agreement (redlined)
Appendix M - Conservation Easement Template (redlined)
Appendix N - Local Concern Species
Appendix O- Glossary